Our Projects

CGCL – Adjustable Pipe Support and Ballast

Project Detailsx

Project:
Adjustable Supports and Ballast Foundations to Pipeline Corridor

Client:
Caribbean Gas Chemical Limited

Location:
LABIDCO Industrial Estate,
La Brea,
Trinidad

Project Overviewx

WCGCL required the design and installation of a new bespoke adjustable support system for the pipelines along the CGCL pipeline corridor within LABIDCO Estate, La Brea.
Alvair was commissioned by CGCL for the conceptual and detailed design, structural engineering and project management of the new ballast foundations and adjustable pipe supports.

 

Services Performedx

  • Conceptual design based on land movement data
  • Civil design of ballast foundations
  • Structural design of new pipe sleepers and adjustable pipe supports
  • Quantity surveying services
  • Preparation of tender documents
  • Construction Management